Estimate the route before promising the date.

Build a transparent low/high launch window from product maturity, baseline category and known complexity triggers.

No email required · assumptions remain visible
1. Starting point
2. Baseline route
3. Scope additions
Planning statusOrientation window
Indicative route duration1123 weeks

Select a start date to see the calendar window.

Baseline work

risk analysis, technical file, labels and market-access controls.

Visible additions

EU economic-operator setup+24 weeks
Not a promised launch date

The model adds planning allowances sequentially. Real tasks may overlap; laboratory availability, corrective work, notified-body involvement and missing evidence can materially change the path.

Method boundary

A sequence model, not a certification forecast.

The estimator intentionally adds scope in a simple sequence so the founder can see what drives time. A product-specific plan may run some workstreams in parallel after dependencies and evidence owners are known.

Use the high case for runway planning. A launch date should only be committed after route, test scope, suppliers and production configuration are reviewed.